20
2014-09
The "seminar on the application of reinforcement and prestress technology in China's construction industrialization" and the "2014 annual meeting of reinforcement and prestress machinery branch of China Construction Machinery Industry Association" were grandly held in Beijing railway building from September 18 to 19, 2014. Chinese and foreign entrepreneurs, experts and scholars gathered together, Mr. Lai Zhiyong, chairman of Shanghai Dirui Reinforcing Project Co., Ltd, as vice president of China Construction Machinery Industry Association, was invited to participate with relevant personnel of the company. The conference focused on the new prospect of China's future reinforcement mechanical connection, reinforcement machinery, reinforcement processing and distribution, prestressed machinery and its application technology
2014-09-20
10
2013-12
On July 10, 2012, the new construction project of Jiamin elevated road (Xinsong road Lianming road and Beizhai road G2 Road) invested and constructed by the highway investment company subordinate to Shanghai Urban Investment started, and it is expected to be completed and opened to traffic in 2014. In the face of many bidders, Shanghai Dirui company stands out with its products of high quality and high price, and has become the final manufacturer of reinforcement connecting sleeve. Since its establishment ten years ago, Shanghai Dirui has created its own reputation with a down-to-earth and steady style and an honest and trustworthy attitude, and has become a leader in the field of reinforcement connection engineering in Shanghai and even East China. In the North-South extension section of Jiamin elevated project, Shanghai Dirui produced
2013-12-10
07
2013-12
Operating procedures for sleeve tapping machine
Operating procedures for sleeve tapping machine 1. Before operation, check whether the main locking bolts are firm and whether the power switch and circuit are in good condition. Wear labor protection articles as required, Non tapping workers are forbidden to operate. 2. Before operation, lubricating oil and grease must be injected into the specified refueling parts. The machine can be operated only after it operates normally, flexibly and reliably. 3. Before tapping, the workpieces and tools to be tapped must be placed neatly and smoothly. 4. Adjust the tap size and depth tapped by the tapping machine to meet the required size before starting the operation. Prevent slippery teeth and insufficient teeth. 5. It is strictly forbidden to wear gloves during operation. Female employees with long hair,
2013-12-07
07
2013-12
Classification of sleeve tapping machines
With the change from pressure welding to mechanical connection of reinforcement sleeve in the construction industry, sleeve tapping machine has become an ideal equipment for producing reinforcement straight thread sleeve. However, there are many kinds of sleeve tapping machines on the market, including the following: 1. Single shaft sleeve tapping machine, also known as vertical drilling sleeve tapping machine, is also the earliest prototype of sleeve tapping machine. It has been nearly ten years and is about to be eliminated by the market. 2. The double shaft sleeve tapping machine is improved on the basis of the single shaft sleeve tapping machine, and the time utilization is more reasonable. It is an ideal equipment in the semi-automatic sleeve tapping machine at present. Generally, the daily output of sleeve can reach 50
2013-12-07
26
2013-11
Maintenance of steel bar straight thread rolling machine
How to solve the trouble of steel bar straight thread rolling machine? 1. If the screw thread is not neat, disordered or not screwed , It can be that the wire roller is damaged and needs to be replaced with a new one 2. If the screw thread length is unstable, the clamping position of reinforcement may be uncertain, and the clamping shall be carried out according to the unified position 3. The flow of cooling and lubricating fluid is small. It may be that the water pump in the straight thread rolling machine does not run. Repair or replace the water pump Maintenance steps of reinforcement straight thread rolling: 1. The cooling liquid must be water-soluble. 2. It is forbidden to roll the thread without coolant. 3. The ends of the reinforcement to be processed shall be flat and cut with a toothless saw
2013-11-26